Queensland has land set aside for at least 360,000 new homes. Fewer than a third are expected within five years.

The Queensland Government's land supply study maps 19,538 parcels set aside for future housing, with room for at least 361,718 homes. It expects 31% of them within five years. Nearly half are ten or more years away or have no timeframe at all. Ipswich and Logan hold a quarter of the urban land.

Published • Data: Queensland Government, Residential land supply (broadhectare study), as published October 2026

Queensland publishes a map of every parcel of land it counts as available for future housing: 19,538 parcels, each with a band for how many homes it could hold and an expected timeframe for when lots will be registered there. Added up, the land has room for at least 361,718 homes. The study expects 31% of them within five years.

Expected timing Parcels Homes (at least) Share of homes
Within 2 years 1,572 30,827 8.5%
2 to 5 years 2,336 81,401 22.5%
5 to 10 years 3,038 74,888 20.7%
10 years or more 3,590 82,315 22.8%
No timeframe set 9,002 92,287 25.5%
All 19,538 361,718

"At least" because the study gives each parcel a band, not a number: 1 to 5 homes, 6 to 20, up to "over 500". We counted the bottom of each band. At the top of each band the same land would hold about 960,000 homes, before the 181 parcels marked "over 500".

48% of the homes are on land expected in ten years or more or with no timeframe at all. "No timeframe" does not mean the land will never be built on; it means the study has not put a date on it.

A quarter of it is in Ipswich and Logan

The study separates urban land from rural residential (large lots). Urban land carries 339,457 of the homes. A quarter of those are in two councils:

Council Urban homes (at least) Share of Queensland Expected within 5 years 10 years or more No timeframe
Ipswich 45,592 13.4% 24% 43% 21%
Logan 40,761 12.0% 26% 37% 20%
Moreton Bay 38,064 11.2% 27% 16% 30%
Brisbane 29,927 8.8% 44% 20% 14%
Gold Coast 27,590 8.1% 62% 6% 0%
Townsville 17,754 5.2% 21% 18% 38%
Toowoomba 15,720 4.6% 28% 11% 40%
Sunshine Coast 10,418 3.1% 55% 12% 13%

The Gold Coast and the Sunshine Coast expect most of their planned homes within five years. Ipswich and Logan, which hold the most, expect about a quarter of it that soon. Outside the south-east, Fraser Coast, Bundaberg and Gympie have no timeframe on about half or more of their urban land (47%, 51% and 74%).

Suburb by suburb

Ripley, in Ipswich, has land for at least 8,804 homes, and 60% of them are expected in ten years or more. Its neighbour South Ripley has land for at least 6,577, 58% of it ten years or more away. Coomera, on the Gold Coast, has at least 5,147, mostly expected in five to ten years. In Logan Reserve, 3,201 of at least 4,521 homes have no timeframe set.

A parcel that crosses a suburb boundary counts in both suburbs, so suburb figures do not add up to the council totals.

What this means if you are buying

Land on this map is the housing a suburb is expected to gain: more neighbours, and over time more traffic, schools and shops. The timing says how soon. A suburb with most of its land due in two to five years is expected to change sooner than one with most of it ten years away or with no date.

How we measured

  • Parcels, timing and home bands are the Queensland Government's Residential land supply study (data.qld, CC BY 4.0), as published in October 2026. Timing is the study's expected period for lots to be registered.
  • Homes are the bottom of each parcel's band; "over 500" counts as 500.
  • Council is the study's own. Suburb figures count every parcel that touches the suburb's boundary.
  • Urban and rural residential are the study's own classes; the Queensland totals include both, the council table urban only.

Queensland suburb pages on SuburbScan show the homes planned in the suburb by timing, and property pages the homes planned within 2 km, wherever the study has land.

Share Facebook X LinkedIn Email

Every figure here names the document it came from. Found a mistake? Tell us and we'll correct it.